July 5, 2002 Here's what it looked like before the construction began. |
August 8, 2002 The foundations are in, the bushes are gone, and the steps have been removed. |
August 21, 2002 The substructure is complete and is ready for the decking to be installed. |
|
September 1, 2002 The decking (5/4" x 6" mahagony) is almost complete. |
September 2, 2002 The base of the deck is complete and the roof support posts have been installed. |
September 10, 2002 Three columns have been installed (there will be a total of seven) along with the roof joists. |
|
September 18, 2002 The columns have been installed along with the roof joists. |
October 1 ,2002 The roof rafters, sheathing, felt underlayment, and fascia board have been installed. |
October 18, 2002 The roof, trim, siding, and gutters are finished, the trim on the bottom has been painted, and the recessed lighting has been installed. |
|
November 4, 2002 The trim, ceiling beadboard, and recessed lights have been installed |
November 11, 2002 I've started painting the trim. Here's a better view of the beadboard ceiling. |
July 1, 2003 The trim, railings, and painting are complete. |
July 12, 2003 The front of the lawn has been re-graded so that the front steps have a flat section to land on. The sod is partially installed.
|
September 6, 2003 It's finished!
|
|